Facility Form

Fill out our Customer Facility Form to receive a personalized analysis of the potential benefits BCR’s solutions can offer you. The information you submit will allow us to provide you with detailed answers specific to your situation and needs.

Submit a Facility Form

Contact Name (required)

Agency/Organization (required)

Title

Phone

Your Email (required)

Address

City

State

Zip

General Facility Information

Plant Name

Plant Address

City

State

Zip

Plant Type: City OwnedCounty OwnedPrivate

 

Plant Capacity & Treatment

Permitted capacity: mgd   Current inflow: mgd
Maximum inflow: mgd   Minimum inflow: mgd
Increase over last 5 years: mgd   10-year projected increase: mgd

Breifly describe biological treatment pre-sludge wasting (e.g. MBR, oxidation ditch):

WAS percent solids from clarifier: %      
Waste sludge flow from clarifier: gpm   gpd
Percent solids to dewatering: %      
Sludge flow to dewatering: gpm   gpd

 

Digestion

Type of digestion: AerobicAnaerobic

Number of digesters: Digester size: gal
Number of Motors: Horsepower: hp Hours per day:

Are there any planned upgrades or rehabilitation to the digesters? yesno

If yes, please describe briefly the plans and potential costs:

Additional Biosolids Treatment (excluding digestion)

Annual biosolids production:
dry tons

Biosolids type:
Class AClass B

Current biosolids treatment system (excluding digestion):
DryerLimeATADother

If other:

Annual O&M cost of additional treatment: $/year

Annual consumables (odor control, chemicals, etc.) cost: $/year

Additional treatment motor load:
Number of motors:   Horsepower:   Hours of use per day:

Do you compost? yesno

Any other biosolids treatment details? (Capacity/odor/regulatory issues? Long-term plans?)

Sludge Dewatering

Does the plant have dewatering facilities? yesno

Solids before dewatering: %   Solids after dewatering: %

Current sludge dewatering equipment:
Gravity BeltScrew PressCentrifugeOther

If other:

Are you adding lime or caustic? yesno

Polymer consumption per month: $/month   lb/month

Electricity cost for additional biosolids treatment: $/yr

Natural gas cost for biosolids treatment: $/yr

Sludge Hauling and Disposition

Sludge hauling cost: $/wet ton

Wet tons per month:

Landfill disposition: $/wet ton

Land app: $/wet ton

Other disposition:    $/wet ton

Energy Consumption

Total annual electricity costs: $/yr   Electricity rate: $/kwh
Total annual natural gas costs: $/yr   Natural gas rate: $/MMBtu

 

Other

Please provide any additional comments or information that could help BCR better understand you biosolids management needs. (Future expansion estimates, regulatory concerns, environmental concerns, etc.)